Victory Sports Ventures
Aerial dusk view of the VSV campus turf fields at blue hour
The Campus

Eight outdoor turf fields. 150,000 sq ft indoor.

A single phased campus on 50 acres in The Lake District, Lakeland, Tennessee. Outdoor and indoor — built together, by design.

8Turf fieldsShaw Sports Turf, FIFA-quality
150,000SF indoorPhase 3 multi-sport fieldhouse
50Site acresThe Lake District, Lakeland, TN
1,000Parking spacesAt full build (Phase 3)
Outdoor

Eight tournament-grade fields. Built in two pods.

Four fields open Phase 1 (August 2026). Phase 2 adds four more for a complete 8-field complex — enough to host the largest regional youth tournaments simultaneously.

  • • Field dimensions: 120 × 75 yards each
  • • Surface: Shaw Sports Turf (FIFA-quality synthetic)
  • • Musco-grade LED lighting
  • • Support building with restrooms, concessions, front office, IT/security
Macro close-up of FIFA-quality Shaw Sports Turf blades backlit by low sun
Interior of a premium multi-sport indoor fieldhouse on a Saturday morning, viewed from the upper concourse
Indoor

A 150,000 sq ft year-round fieldhouse.

Phase 3 unlocks year-round, weather-proof programming — and adds basketball, volleyball, futsal, and pickleball at scale to the campus.

  • Full 11v11 indoor soccer field
  • 8 hardwood basketball courts
  • 4 dedicated pickleball courts
  • Volleyball + futsal + multi-sport flex space

Why Lakeland

Inside The Lake District — a development already pulling families to Lakeland.

VSV doesn't open in a vacuum. The campus drops into a 160-acre $300M mixed-use development with 2,000+ on-campus residents at full build. Demand is built into the foundation, not chased afterward.

Family of four crossing the facility parking lot on a tournament morning, kids in athletic gear
160Lake District acresMixed-use master plan already underway
$300M mixed-useAdjacent investmentRetail, office, residential, hospitality
2,000+On-campus residentsCaptive demand at full build
#3School district rankIn Tennessee — anchors family relocation
Master Plan

The full campus, phased over three deployments.

VSV Lake District site plan — eight turf fields in two rows flanking the 150,000 sq ft indoor main complex

August 2026

Phase 1

Four FIFA-quality turf fields. Lights. Concessions. Open.

2028

Phase 2

+4 turf fields. 8 total. Multi-event tournament capacity.

2030

Phase 3

150,000 SF indoor. Year-round basketball, volleyball, futsal.

Get in Touch →