Eight outdoor turf fields. 150,000 sq ft indoor.
A single phased campus on 50 acres in The Lake District, Lakeland, Tennessee. Outdoor and indoor — built together, by design.
Eight tournament-grade fields. Built in two pods.
Four fields open Phase 1 (August 2026). Phase 2 adds four more for a complete 8-field complex — enough to host the largest regional youth tournaments simultaneously.
- • Field dimensions: 120 × 75 yards each
- • Surface: Shaw Sports Turf (FIFA-quality synthetic)
- • Musco-grade LED lighting
- • Support building with restrooms, concessions, front office, IT/security


A 150,000 sq ft year-round fieldhouse.
Phase 3 unlocks year-round, weather-proof programming — and adds basketball, volleyball, futsal, and pickleball at scale to the campus.
- Full 11v11 indoor soccer field
- 8 hardwood basketball courts
- 4 dedicated pickleball courts
- Volleyball + futsal + multi-sport flex space
Why Lakeland
Inside The Lake District — a development already pulling families to Lakeland.
VSV doesn't open in a vacuum. The campus drops into a 160-acre $300M mixed-use development with 2,000+ on-campus residents at full build. Demand is built into the foundation, not chased afterward.

The full campus, phased over three deployments.

August 2026
Phase 1
Four FIFA-quality turf fields. Lights. Concessions. Open.
2028
Phase 2
+4 turf fields. 8 total. Multi-event tournament capacity.
2030
Phase 3
150,000 SF indoor. Year-round basketball, volleyball, futsal.